4 ms·
You can shift electricity a thousand+ miles with minimal losses. Outside of small islands the real limitation is political borders. You can easily used pumped
by Retric 10y ago
You can shift electricity a thousand+ miles with minimal losses. Outside of small islands the real limitation is political borders. You can easily used pumped hydro on any major landmass, but ideal locations are often across a border which very closely ties your infrastructure with another country.
PS: The Rio Madeira transmission link in Brazil, with an overhead length of 2,385km, is the world's longest power transmission line. The geometry get's complex as you can effectively sift power from location A to D by offsetting the direction you send power from intermediary production at B and C.
- takk309 10y agoI was under the impression that line losses were rather high, until I did a quick bit of research and found that they are at around 5 to 6% nation wide [1]. At those levels, it can easily make sense to transmit the power to a location that has better storage. [1] https://www.eia.gov/tools/faqs/faq.cfm?id=105&t=3 https://www.eia.gov/tools/faqs/faq.cfm?id=105&t=3
- mcguire 10y agoThe real limitation is mostly technical: dynamically matching supply and demand when some or most of your supplies' outputs are directly controllable is a hard problem in a large, complicated, distributed grid.