3 ms·
There were concerns about the emergency spillway 12 years ago, but the request (to pave the emergency spillway with concrete) was rejected [1]. It was supposed
by manarth 10y ago
There were concerns about the emergency spillway 12 years ago, but the request (to pave the emergency spillway with concrete) was rejected [1].
It was supposedly designed to handle 350,000 cubic feet per second, but began to fail at around 6,000 to 12,000 cubic feet per second.
[1] https://news.ycombinator.com/item?id=13633395 https://news.ycombinator.com/item?id=13633395