3 ms·
Automation as defined by that comment is a really low bar. It probably is possible. > That means an engineer can design an oil well at his desk. With the press
by leereeves 10y ago
Automation as defined by that comment is a really low bar. It probably is possible.
> That means an engineer can design an oil well at his desk. With the press of a button, an automated system would identify the equipment needed from a supplier, create a 3D model and send instructions for building it out into the field, Hashmi says. “That is automation.”
I'd be very surprised if that doesn't already exist: printing a 3D model, submitting an order for the parts, and sending the documentation to the field.
That's assuming the engineer has identified the parts and written the instructions. Automatically doing that might be more of a challenge.
- XorNot 10y agoIt's not hard to imagine a search engine which matches mechanical descriptions of parts to a proposed design automatically. Just draw roughly what you need, punch in the specs, and let the expert-system provide a least-cost bill-of-materials which comes nearest the ratings + a list of custom parts.
- ArkyBeagle 10y agoWho is going to do provenance on the parts list? You know that all organizations that buy parts have an entire fleet of people to do this, right? It goes all the way from vendor accounting to physical inventory to finance to shipping to engineering to production to...
- ryanmarsh 10y agoOMFG the hubris. I don't know where to start. Oil and Gas exploration and production are a Hard Problem. Visit the Offshore Technology Conference sometime.
- semi-extrinsic 10y ago> printing a 3D model, submitting an order for the parts, and sending the documentation to the field. Hahaha. No, let me talk you through it (assuming we are talking new technology, as opposed to a small refinement of existing stuff): Engineer sits at his desk/wherever and has an idea for some equipment. We're at TRL 0 (following API 17N). Engineer spends some time demonstrating and documenting how it's likely that this solution will work, possibly involving CFD and/or FEM work. We're at TRL 1. Engineer gets a simple scale model built, and the scale model is laboratory tested to prove that the concept is likely to work. We're at TRL 2. Engineer gets a (downscaled and/or simplified) prototype built and tested over a limited range of operating conditions. We're at TRL 3. Engineer (but really, now we're talking the company) gets a first full scale version built, and this is tested at realistic operating conditions. TRL 4. The full scale version is integrated with the actual system which it will be running in. TRL 5. This is basically "first deployment", and you've probably spent a few hundred thousand dollars at this point, if not much more. Your first deployment case has run for an extended period of time under a range of real conditions. TRL 6. The solution is now proven, and can be promoted to other facilities that don't want to be the first adopter. Your technology has run for a significant amount of time at several installations under a wide range of conditions. The technology is now proven. TRL 7.
- leereeves 10y agoAccording to the article, what I quoted is what Hashmi described when he said “That is automation.” If that's what he's talking about, I think it's possible if not already in place. But I agree, replacing all the testing and the skills of an entire company is another matter entirely, and there is certainly a lot more to be done than was described in the comment I was talking about.