> The mean overrun by project type goes solar < wind < thermal (fossil) < nuclear < hydroelectric. That's basically the same ordering as "minimum viable project
by jessriedel 10y ago
> The mean overrun by project type goes solar < wind < thermal (fossil) < nuclear < hydroelectric. That's basically the same ordering as "minimum viable project size."
Relatedly, MIT Prof. Dennis Whyte argues that this is a/the key friction for the development of fusion power in this excellent semi-popular talk
https://youtu.be/KkpqA8yG9T4 https://youtu.be/KkpqA8yG9T4
In particular, he thinks the latest generation of superconducting magnets will lower the minimum-viable size of fusion power plants, which will have a big impact on the feasibility of them being built by human institutions even if their raw numbers on paper are comparable to older style tokamaks.