3 ms·
Here's an apple, there's an orange. This battery project can be built in small increments and does not require local land in a proper geometry that can be floo
by greglindahl 10y ago
Here's an apple, there's an orange.
This battery project can be built in small increments and does not require local land in a proper geometry that can be flooded. Most good pumped storage possibilities in the US are built out already. Pumped storage also wastes more of the stored energy.
It took 7 years to build the hydro facility? Wow.
- jws 10y agoThe recently rebuilt (2010) Taum Sauk reservoir only manages a 70% efficiency according to Wikipedia. I'm not seeing a number published for the Powerpack but I'd guess a 90% ballpark.