4 ms·
Actually, that existing track is part of the problem, not the solution. A new high-speed train is much easier to justify economically when you're looking at (to
by jerf 10y ago
Actually, that existing track is part of the problem, not the solution. A new high-speed train is much easier to justify economically when you're looking at (total benefit of high-speed rail) - (cost of high speed rail) than when you're looking at ((total benefit of high-speed rail) - (total benefit of current rail)) - ((cost of high-speed rail) + (cost of removing current rail if necessary)).
There's a name for this effect, but I can't remember it. Another example in the real world is the effectiveness of putting up cell towers in developing countries rather than running wires for landlines.
- otoburb 10y agoPerhaps you're referring to the term "leapfrogging", the topic of which Kevin Kelly offers a differing viewpoint from the mainstream acceptance despite explaining this in 2006[1]. [1] http://kk.org/thetechnium/the-myth-of-lea/ http://kk.org/thetechnium/the-myth-of-lea/