I'm assuming the plan is that a 15x50MW install isn't going to use 15x the 1x50 personnel and site prep. Otherwise there'd be no way they're viable except for s
by ethbro 10y ago
I'm assuming the plan is that a 15x50MW install isn't going to use 15x the 1x50 personnel and site prep. Otherwise there'd be no way they're viable except for smaller requirement installs.