3 ms·
50 MW is small for all the red-tape necessary to operate a nuke plant. 1500 MW is nice if you're going to need over 1,000 staff. I'm not sure how much headcount
by throwaway7645 10y ago
50 MW is small for all the red-tape necessary to operate a nuke plant. 1500 MW is nice if you're going to need over 1,000 staff. I'm not sure how much headcount they could eliminate with a better design.
- ethbro 10y agoI'm assuming the plan is that a 15x50MW install isn't going to use 15x the 1x50 personnel and site prep. Otherwise there'd be no way they're viable except for smaller requirement installs.