4 ms·
I'm in the Waterloo region, which is partway through a multi-year light rail construction project. The line is really relatively simple and not all that long (1
by mikepurvis 10y ago
I'm in the Waterloo region, which is partway through a multi-year light rail construction project. The line is really relatively simple and not all that long (19km), but took over a decade of fighting to get approved, costs almost $1B, and has been a huge undertaking to build (not to mention all the nonsense from Bombardier, who are supposed to be building the trains).
But it's been fascinating to compare this to how inner-city rail projects went in the early 20th century— basically some company would get permission, lay down a bunch of track in the middle of the street, and be running trains within a few months. You see similar stuff with early electrification projects, where basically whoever could just come along and string their wires between lamp posts.
I totally see that that's insane, and we can't have a wild west with our infrastructure, but I do also wonder if there's not a middle ground that would allow somewhat more agility with these things.
- walrus01 10y agoAs things get more rural, and literally more wild west, it's possible to bring down the cost of OSP fiber infrastructure significantly. There's ISPs in rural western states building GPON networks along roadways/right of way (trenched/duct and aerial) with crews that consist of basically two guys and a bucket truck with a spool on it, and a $3000 fusion splicer from china.
- contingencies 10y agoTaobao suggests $1000-1500 is enough for a fusion splicer. https://s.taobao.com/search?q=熔接机 https://s.taobao.com/search?q=熔接机
- walrus01 10y agoyes, for a basic one, there's lots of good fusion splicers for $1500-2000 from china. keeping in mind you'll need an additional $500-600 of precision hand tools, tools for dealing with OSP fiber cables, cleaning supplies and stuff to go with it, a fusion splicer by itself is not very useful.