When I was a manufacturing engineer, I used to have a short list of long term projects, a fair list of medium term projects, and a long list of tasks. A rolling
by nhebb 10y ago
When I was a manufacturing engineer, I used to have a short list of long term projects, a fair list of medium term projects, and a long list of tasks. A rolling todo list was the only way to stay on top of things.
You can't be the Pinball Wizard when the job requires you to be the pinball.
- bigger_cheese 10y ago>When I was a manufacturing engineer, I used to have a short list of long term projects, a fair list of medium term projects, and a long list of tasks. A rolling todo list was the only way to stay on top of things. I'm in a similar situation. This is what works for me. I use a spreadsheet to keep track of what I'm working on currently and my progress so far. I don't update it all the time - probably something like every 3 to 4 days. sometimes it's as simple as adding a line to say "Emailed Phil with my recommendations, waiting to hear back from him - call him if no word by 23rd". I'm constantly having to jump between various projects. This is the only way I've found to keep track of status of various things. Sometimes I'll be out on plant dealing with an issue all day or supervising a trial or tied up with meetings etc. Before I adopted this system it was a nightmare picking things up again after a few days away from my desk.
- cableshaft 10y agoA spreadsheet is an interesting thought for juggling status of a bunch of different projects. I'll try that, thanks!
- oddlyaromatic 10y agoCheck out airtable- I use it for a similar purpose for long term things.