I was working a contract at a large, old company. They had allocated hardware budget at the beginning of the year, but since we were brought in in late fall, a
by hinkley 10y ago
I was working a contract at a large, old company. They had allocated hardware budget at the beginning of the year, but since we were brought in in late fall, and because the owner of the contracting firm was all sizzle and no sausage regarding Continuous Delivery, we only had enough hardware allocated for two stages of a CD pipelIne.
One of my fellow contractors asked for a laptop and his iMac was sitting there, so I pounced on it and eventually set up a set of docker images containing a couple of Jenkins slaves, headless selenium with Chrome and Firefox, and a couple of nginx reverse proxies.
If I had stayed on longer with the project I might have reconfigured the hardware we did have to run more of the backend code.
It has been really sad how often I've worked at places where some of our best engineering effort was spent on dealing with hardware shortages. Especially since they will inevitably hire another developer or two to make up for all the lost productivity that could have been fixed with $10K a year in hardware budget.
It doesn't surprise me in the least to see someone spending time figuring out how to run a kubernetes cluster on cheap hardware.
- JoeAltmaier 10y agoI was working to create a FibreChannel router. It had EEPROMs to boot from. We were a remote site; got our hardware from the main office which had a large lab. They quit sending us blank (erased) EEPROMs. We quickly ran out. I called, asked "Why did the EEPROMs stop arriving?" Answer: we had to return some before they would send any more (we had a dozen used ones on hand). They were delaying a project that cost $100K per day, because somebody in the lab was annoyed at buying so many $50 EEPROMs.
- seanp2k2 10y agoYep, in any business scenario where people are being paid any kind of reasonable salary, the cost of labor far outstrips the cost of hardware and makes replacing this project with a $2k server from Dell or some AWS instances / droplets a "no-brainer". Consider support and maintainability as well.
- slim 10y agoUnless you live in developing world. In which case labor is typically cheaper than hardware
- hinkley 10y agoIt's heartwarming to think that my boss is treating me like third world labor. ;)
- hinkley 10y agoAre you aware of any documentation or literature on general ratio of labor to hardware budget for projects? I'd love to have something to throw at people when they start this sort of thing. The silliest part is that when you ask they always talk about how they budgeted for the developers but there's no extra money in the budget for hardware. As if you're getting the same work out of people you shafted for equipment. Yes, your budget looks great, but your profit margin goes to hell because it takes longer to bill your customers.
- hinkley 10y agoWe had two VxWorks machines but only one flash disk that was the right size to work with the ROMs, so we couldn't do integration and validation at the same time. So stupid. The thing is the size they needed was 1 size smaller than anyone still sold. One day I drove halfway across town to a camera store where they dug through their leftovers drawer and found me one. $16 with tax IIRC. I just billed the hour it took me to make the trip and made everyone promise not to make a big deal about the mysterious appearance of a second card.