3 ms·
Sometimes, the time estimate that is put down on paper does not really matter at all. The estimate will force the engineer to think through their planning rathe
by yitchelle 10y ago
Sometimes, the time estimate that is put down on paper does not really matter at all. The estimate will force the engineer to think through their planning rather than just doing things adhoc.