3 ms·
It's kind of mind blowing that a building of this magnitude would go in a location that is bay fill in a region renowned for earthquakes, yet not have pilings g
by pstuart 10y ago
It's kind of mind blowing that a building of this magnitude would go in a location that is bay fill in a region renowned for earthquakes, yet not have pilings going down to bedrock.
The real aftershocks are going to be the lawsuits over this.
- nashashmi 10y agoUnless I am losing my memory, I remember learning in geology class that seismic waves travel the least in clay and most in rock.
- knorby 10y agoSoil liquefaction is the real risk during earthquakes. Clay absorbs the energy and shakes a great deal more, and the soil can potentially destabilize further and allow structures to sink in.
- wlesieutre 10y agoFor anyone not familiar, this is an effect where if you load wet soil just right it will break the structure of the soil grains and turn into a fluid. Demo here, you can skip the first minute if you're short on time: https://www.youtube.com/watch?v=-X9-4tWpMCo https://www.youtube.com/watch?v=-X9-4tWpMCo Wikipedia has more information and some good photos: https://en.wikipedia.org/wiki/Soil_liquefaction https://en.wikipedia.org/wiki/Soil_liquefaction It's a really cool and equally terrifying phenomenon if you're used to thinking of the ground as a solid object. Plenty of videos on YouTube as well. EDIT- Here's a car that sunk into the ground, which then resolidified around it: https://youtu.be/2WoKu5VxKgs?t=50 https://youtu.be/2WoKu5VxKgs?t=50 http://izismile.com/2012/08/31/christchurch_liquefaction_26_pics.html http://izismile.com/2012/08/31/christchurch_liquefaction_26_...
- myegorov 10y agoPile foundations are impractical for much of San Francisco founded on bay mud (bedrock hundreds of feet below surface). There're other practical solutions - including soil improvement, micropiles and/or raft foundation - that have been proved capable of supporting highrises. On a different note, a settlement (even differential) in excess of one foot is expected for a significant fraction of building stock in SF in the event of a "design-level" earthquake. The tower is reportedly 6" out of plumb. Over its 600ft height, that's 0.08%. For perspective, it is generally accepted that construction tolerances will result in a building 1/500, or 0.2%, out of plumb at the time of erection.