3 ms·
You'd still be filling the pipe. And possibly filling many small(er) pipes at interconnection points. The last meters of pipes into a rack isn't where the issue
by noselasd 10y ago
You'd still be filling the pipe. And possibly filling many small(er) pipes at interconnection points. The last meters of pipes into a rack isn't where the issues are.