3 ms·
The shuttle uses 4 separate 1.2MHz IBM AP-101 operating in lockstep / redundant systems, with a 5th running an independent system. I assume the fifth is setup
by Retric 17y ago
The shuttle uses 4 separate 1.2MHz IBM AP-101 operating in lockstep / redundant systems, with a 5th running an independent system. I assume the fifth is setup in case of software failures.
http://en.wikipedia.org/wiki/IBM_AP-101 http://en.wikipedia.org/wiki/IBM_AP-101
http://en.wikipedia.org/wiki/Space_Shuttle http://en.wikipedia.org/wiki/Space_Shuttle
PS: It's easy to forget just how old and hacked together the Space Shuttle is: Historically, the Shuttle was not launched if its flight would run from December to January (a year-end rollover or YERO). Its flight software, designed in the 1970s, was not designed for this, and would require the orbiter's computers be reset through a change of year, which could cause a glitch while in orbit. In 2007, NASA engineers devised a solution so Shuttle flights could cross the year-end boundary.[38]
- brk 17y ago* I assume the fifth is setup in case of software failures.* It is. The 5th has just enough to get the shuttle home, and is designed by a separate team. The presumption being that anything that knocked out the first 4 is probably a systematic failure.
- skoob 17y agoThat's weird. Why would they even need date logic in the flight software?
- sophacles 17y agoIt probably has something to do with where to point the thing during re-entry. The shuttle would need to be able to land on different days in case something went wrong. Actually, the date stuff is probably used for all sorts of orbital calculations.
- kjhgfvgbjnm 17y agoIt doesn't - but can you guarantee that everything it is talking to doesn't also change? A GPS string might erroneously say it's day 367 or be one character too long because it printed 20010 or a telemetry link might ask for 4million readings because it calculated "-1"