26 ms·
Tesla added an additional assembly line at the Fremont plant.[1] This doubled production capacity. Cost about $100M. They already run two 9-hour shifts and six
by Animats 10y ago
Tesla added an additional assembly line at the Fremont plant.[1] This doubled production capacity. Cost about $100M. They already run two 9-hour shifts and six days a week.
[1] http://insideevs.com/teslas-2nd-production-line-capable-pumping-3000-tesla-per-week/ http://insideevs.com/teslas-2nd-production-line-capable-pump...
- te 10y agoThat article is two years old.
- Animats 10y agoGood point. Do they have more final assembly lines now, or what? The info two years ago indicates the final assembly lines were maxed out. Here's a long video of the assembly process in 2015.[1] This is useful, rather than the usual quick montage of cool robot scenes. There was a surprising amount of manual assembly in areas where other manufacturers are automated. [1] https://www.youtube.com/watch?v=AVCCroN7vS0 https://www.youtube.com/watch?v=AVCCroN7vS0