3 ms·
Reminds me a bit of the CitiCorp Center fiasco. http://failures.wikispaces.com/Citicorp+Center http://failures.wikispaces.com/Citicorp+Center Not only did the
by ams6110 10y ago
Reminds me a bit of the CitiCorp Center fiasco.
http://failures.wikispaces.com/Citicorp+Center http://failures.wikispaces.com/Citicorp+Center
Not only did the architect miscalculate the worst-case wind load on the building but the builder substituted cheaper bolted steel connections for the originally-specified fully welded connections.
The problem was remediated by heavily reinforcing the connections of the diagonal steel braces in the frame of the building, but until it was done there was a very real chance of the building blowing over.
- clintonb 10y ago99% Invisible has a story on that building, and how the issue was discovered: http://99percentinvisible.org/episode/structural-integrity/ http://99percentinvisible.org/episode/structural-integrity/.
- MichaelApproved 10y agoIt was hurricane season and the repairs were done as a major storm was approaching. > Three Meteorological experts were retained to provide updates three times throughout a day. An emergency evacuation plan was developed in conjunction with local law enforcement, search and rescue, firefighters, major city authority figures, and shelters. 2000 emergency red cross workers were kept on stand-by in the event of a failure.