3 ms·
You dig down 200 feet to the bedrock, pour a foundation, and then pour pilings up to the surface to put the building on.
by jonah 10y ago
You dig down 200 feet to the bedrock, pour a foundation, and then pour pilings up to the surface to put the building on.