2 ms·
Both. Etherium's smart contract system turned out to be too hard to program correctly, and the DAO botched their program. Etherium needs to go back into the sho
by Animats 10y ago
Both. Etherium's smart contract system turned out to be too hard to program correctly, and the DAO botched their program. Etherium needs to go back into the shop for a redesign. Maybe a full virtual machine is the wrong model for contracts. The problem with programs as contracts is that the goal of contracts is predictability. Something more declarative might be more predictable.