6 ms·
Yes and no. The limit until 2010 was 670m in nearly all parts of western europe. Block signals, crossroads, stations… need to be made sufficient long enough. W
by rmoriz 10y ago
Yes and no. The limit until 2010 was 670m in nearly all parts of western europe. Block signals, crossroads, stations… need to be made sufficient long enough.
With ETCS [1] there are no "fixed" physical block segements anymore. They are simulated in software and allow a much higher densitiy of trains and also longer trains.
While SBB is highly motivated to roll out and migrate their legacy signalling systems, it's still a long way. The new Gotthard Base Tunnel is already built ETCS-only.
https://en.wikipedia.org/wiki/European_Train_Control_System https://en.wikipedia.org/wiki/European_Train_Control_System