3 ms·
As someone who studied the field, construction in abstract seems a waterfall model. Construction in practice requires something very similar to agile: too many
by ethbro 10y ago
As someone who studied the field, construction in abstract seems a waterfall model. Construction in practice requires something very similar to agile: too many uncontrolled real world variables, interdependent timelines, and sheer laws of physics.
If everything goes right, yes waterfall. Everything never goes right.
- mixmastamyk 10y agoIn rare circumstances everything must go right beforehand, e.g. the New Horizons probe to Pluto.