2 ms·
I've only seen that in older buildings in the US. In new buildings (~1970+) I've always seen what I consider the standard: live hot and neutral to the switch.
by quesera 10y ago
I've only seen that in older buildings in the US.
In new buildings (~1970+) I've always seen what I consider the standard: live hot and neutral to the switch. Hot is switched to the fixture, and neutrals from both sides are tied together in the box.