4 ms·
I don't practice in Canada, but my understanding was that the CSA is an analogue to the ASTM codes here in America (and internationally apparently, if you belie
by abduhl 10y ago
I don't practice in Canada, but my understanding was that the CSA is an analogue to the ASTM codes here in America (and internationally apparently, if you believe their name change). ASTM codes are very thorough when it comes to materials testing. I believe Europe has a similar standard.
I don't understand how your third paragraph's thrust follows from your second paragraph - what does materials testing have to do with site specific (railway) or field changes (bent rebar)?
How long did you practice in Canada? Your viewpoint of engineers meshes well with the opinion that I've heard from a lot of junior level engineers who are just making the adjustment to a mid-level position but are still interacting with the lower level staff who are, as you say, typically helpless. They are supposed to be - they are still learning.
- 3pt14159 10y agoOnly about 3 years before I got fed up and left. I'll fully admit I didn't get that involved with materials testing; and perhaps the firm I was with was substandard in this regard; but I don't think so. When I looked into the falling glass in Toronto I learned that they only tested a very small number of fasteners. I don't recall the number, but it was trivial statistics to prove that for the number of glass panes going up in Toronto they didn't have a large enough "n". The two examples I gave were two examples that I dealt with personally. I was extremely dismayed at the rigour the firm I was at used. To test the bent rebar I think we used a sample size of 6 and then tested to failure. For the railways example they just used the weight of the train. Then when I reviewed the designs and brought up that the train could apply the breaks and thereby increase the downward force they just multiplied everything by 2. In my experience the low level staff was useless, with a couple people that knew what they were doing. The medium level staff had two groups of people, the people that still knew advanced math and the people that got good at AutoCAD, and the senior people, while good at sales or general guidance; had basically completely forgotten all but the most basic structural engineering principles. I've literally had to explain crushing vs bending moment to a 20 year structural engineer before. I've (accidentally) designed a structure that was already designed by a senior person that forgot to put it in the tracking system. I used one sixth the steel and mine could handle more load. I will grant you, however, that I may have just been at a substandard firm. We had some large projects, but we weren't designing new skyscrapers or mega-structures.
- abduhl 10y agoFor someone who is self-admittedly not knowledgeable about the testing requirements, you seem very certain of your conclusions about this Toronto falling glass problem. Testing of components is usually by the manufacturer and it is their responsibility to provide a product that meets the requirements of the design. This is not a problem from the design side and is very difficult to prevent without the engineer being onerous with his requirements to a point that no engineer is really willing to go to. I'm not familiar with the specifics of your rebar example so I can't comment. Your example with the train makes no sense - the design loading for railway is codified in the design manual (AREMA in the USA) and includes dynamic forces. Braking forces are applied longitudinally to the track so unless you were in a curve there is no downward force. I find it hard to believe that your boss agreed with a fictitious force and then just multiplied everything by 2 to get around it. Your opinion on your colleagues is concerning to me and is probably more indicative of your lack of experience than the other staff's incompetence. Your experience reads like someone suffering from 200th hour syndrome, I wouldn't be surprised that if you stuck with it another 3 years you would have realized your initial impressions were way off base. At worst, it sounds like you may have been working at a firm that did commodity work and didn't attract top tier talent. If you are as good as you seem to think you are then you should have jumped ship when you got "fed up". I don't intend for this post to sound dismissive but it will probably come off that way. As an aside, knowledge of advanced math is not necessary for structural engineering in my opinion, nor is it common.
- gchpaco 10y agoI'm not competent to explain why Tacoma Narrows failed, but it obviously wasn't up to design load. The existence of large sheets of glass falling off buildings and endangering people from multiple different installations strongly indicates that someone botched something.
- kentt 10y agoWhat is 200th hour syndrome?
- 10y ago