2 ms·
> The original poster's comment can only be construed in one way: the Swiss do things this way, it is better, and therefore everybody else does it wrong. The cl
by Annatar 10y ago
> The original poster's comment can only be construed in one way: the Swiss do things this way, it is better, and therefore everybody else does it wrong. The claim (50% spent on planning) is clearly and demonstrably wrong.
That is correct, in my experience the Swiss way is the best way, and I have yet to work in another country (and I'm international) where they do it better or with more planning and forethought. The only other mentality which comes close to that is that of Japanese. This is obviously anecdotal, but to me it is perfectly understandable why the Swiss managed to do it within time and budget constraints. Everywhere else I've worked, and what I've seen, it was not as good.
I've put the Swiss saying that planning is 50% of the work to the test, and have had great results with it. Again this is anecdotal, but to me, it confirms that their way of thinking is correct, and I appreciate it.
By the way, the article in German mentions multiple times that certain challenges which were met were expected because they were identified during the planning and preparation stage.