This is $12.5b and 17 years for a 35 mile tunnel through solid rock. Seattle's transit plan is $50b, 25 years, and laying tracks on grade. Probably about the sa
by WalterBright 10y ago
This is $12.5b and 17 years for a 35 mile tunnel through solid rock. Seattle's transit plan is $50b, 25 years, and laying tracks on grade. Probably about the same number of miles.
http://seattletransitblog.com/2016/03/24/st3-draft-plan-overview/ http://seattletransitblog.com/2016/03/24/st3-draft-plan-over...
- ptaipale 10y agoHowever, building passenger transit in an urban area is a very different thing, even if a long underground tunnel is a challenge in itself. Mining through solid rock is not really that expensive these days. But when building metropolitan transit, arranging traffic around of an existing population is not easy, and building transit stations is an expensive business. Making a tunnel through solid, hard rock is in any case cheaper than making a tunnel through non-solid earth which needs to be supported for every inch all the time. Regarding cost of mining solid rock: in fact, where I live, I think in the construction of underground train line, the actual cost of mining is pretty much offset by the price for sale of rock matter, which is then used for claiming land from sea to construct new housing. It is fairly silly over here because we have a low population and lots of land, but when the city claims new land, it can build there and sell it without purchasing it from existing owners, and all the increase in land value from zero (in fact no land at all) goes to the pockets of the city, and the pockets that the city chooses.
- orf 10y agoReally? The Cross rail project in London cost only 2bn more than the Swiss project but does exactly that, create an entirely new line under the whole of London, which is ridiculously hard to dig under (or so I've heard). Why the hell does it cost $50bn for you?
- MagnumOpus 10y agoCross-rail runs mostly on existing lines. Only 13 miles of the 85 total are new tunnels, so cost per mile is still almost a billion dollars. (Being a bit unfair here, because the tunnelling cost is probably less than half the cost - the other half being rebuilding half a dozen massive underground train stations while keeping them operational.)
- orf 10y agoWhere did you read that? The project site says they have created 26 miles of new tunnels, also wider ones than ever before (6.2m). As well as 10 new stations. And all of this is slap bang in the middle of Europe's biggest city, which is pretty damn poorly laid out and not exactly conducive to huge scale construction projects.
- ptaipale 10y agoWikipedia says: "The project's main feature is 21 km (13 mi) of new twin tunnels." So that 26 miles counts the tracks both ways. Well, it's not a short way, 42 km is a marathon.
- orf 10y agoTrue, but it's not like building a dual carriageway where it's essentially one road split in two, it's two independent tunnels running mostly in parallel. I'd wager that's more than twice as hard to do.
- tobltobs 10y ago> Mining through solid rock is not really that expensive these days. If there would have been only solid rock the swiss would have build this tunnel centuries ago. There was a lot of slippery rock in between.
- ptaipale 10y agoPerhaps not centuries ago, but decades, yes.
- usrusr 10y ago> Regarding cost of mining solid rock: in fact, where I live, I think in the construction of underground train line, the actual cost of mining is pretty much offset by the price for sale of rock matter Any chance that you are living near https://en.wikipedia.org/wiki/Drammen_Spiral https://en.wikipedia.org/wiki/Drammen_Spiral ? I would have dismissed your claim as totally absurd had I not read about this gem of an improbable building project before!
- ptaipale 10y agoNo, not Norway, but Finland. However we have similar solid and hard bedrock, and the same economic logic where rock chips are needed in construction.
- Shivetya 10y agoThe sad part is how much they are not getting for all these dollars. Figure with Portland around six percent of workers use the transit system. If your in the crowd making less than 75k then it goes up to eight percent. Forty percent of the nations mass transit use occurs in NYC. Its even gone down everywhere but there. The cost per mile to install is staggering, but worse is that many systems are deferring maintenance and even worker pensions. Also while fees to ride are subsidized most don't understand that all maintenance has to be subsidized too. Throw in the silliness that is streetcars whose existence seems to only be to subsidize those who make them and we are just throwing money away If you want to know how many ride the government can tell you. Go to http://factfinder.census.gov/faces/nav/jsf/pages/index.xhtml http://factfinder.census.gov/faces/nav/jsf/pages/index.xhtml, do an advanced search for B08519 The percentages aren't good