3 ms·
I don't think this is a strong driver. GE 1.5 MW turbines only have a relatively small space near the base of the tower that is consumed by power electronics a
by brandmeyer 11y ago
I don't think this is a strong driver. GE 1.5 MW turbines only have a relatively small space near the base of the tower that is consumed by power electronics and control systems.
Siemens has largely gone to a system where everything is in the nacelle. This way it makes it easier to completely test and connect the power electronics and control, since more of the work is done at the factory instead of in the field. Labor and equipment is much more expensive in the field than in the factory.