I was there in the mid-nineties, and it was absolutely a thing in enterprise style IT. There were also several books on the matter, and also revised waterfall
by coldtea 11y ago
I was there in the mid-nineties, and it was absolutely a thing in enterprise style IT.
There were also several books on the matter, and also revised waterfall models. The very term was not always used early on (though around the nineties it did), but the schemes were the same.
Lots of public projects, including some I've been involved, were designed and managed in such a way.
There were no changing requirements until the things were delivered, which could take 1-2 full years. The design phase resulted in monstrous 400 or 800-page documents covering every aspect, and to apply for such a software tender you needed to write those in excruciating detail (I did that too for several projects).
The waterfall model, with the name and all, was also taught at our university (early/mid nineties). XP wasn't even mentioned back then at our level, though we discovered it on our own, reading Fowler, Beck et al in the late nineties.
There's some tinfoil conspiracy theory thrown around that Waterfall was never a thing etc, and it was just used to push Agile etc. I wonder what its adherents did in the 80s and 90s, but surely not programming in large enterprise/public/military etc software projects.
(That Waterfall cannot work is another thing altogether -- nobody did it 100%, as nobody does Agile 100% today).