2 ms·
Really, their testing was inadequate. If your product is a timeline graph, you should test it with data covering a large range across the possible time values.
by gpvos 11y ago
Really, their testing was inadequate. If your product is a timeline graph, you should test it with data covering a large range across the possible time values. A single date from before roughly 2000 would have uncovered the problem.
(Not that I always test adequately, mind you.)