4 ms·
It would cost $200m to add tracks to the 520 bridge, and there's an existing 100 foot wide right-of-way from Renton to Bothell. I.e. for less than a billion and
by WalterBright 11y ago
It would cost $200m to add tracks to the 520 bridge, and there's an existing 100 foot wide right-of-way from Renton to Bothell. I.e. for less than a billion and a couple years, the trackage could be more than doubled, and more than double the communities served.
The fact that this is not part of the 25 year $50b plan means something is terribly broken about Seattle's mass transit plan.
- thrownaway2424 11y agoIt would cost that much just to add the pontoons to the bridge. The cost of actually adding more bridge width and the rails thereupon would be more.
- WalterBright 11y agoI read that the 520 new bridge was build to accommodate light rail with $200m in additional spending.
- thrownaway2424 11y agoDid you read that from WSDOT? WSDOT says this: "How much would it cost to add light rail to the floating bridge? [...] Secondly, it would cost between $150 million and $200 million to construct the 30 additional pontoons and to install them on the floating bridge, alongside the 77 pontoons required for the six-lane bridge. There would be other costs associated with the bridge deck expansion and other infrastructure, including rail lines."
- WalterBright 11y agoYes, that's what I'd read, and apparently it would cost more. But it clearly is designed to accommodate the rail expansion, rather than having to build yet another bridge for that.
- CamperBob2 11y agoWith all due respect, you'd have to be on drugs to think they could actually do that for $200M, or put the Renton-Bothell line back into service for $1B. Forget autonomous cars, that will happen right around the time personal holodecks are coming online. What's your plan for when they start running commuter trains through your back yard?
- WalterBright 11y agoThose tracks have always been there, and anyone who bought property next to a rail right-of-way would have known it, just like anyone who buys waterfront property has no business complaining about boat traffic. And frankly, I'd much rather have electric trains running nearby than a major road with all the car noise and exhaust. Why would it cost billions to put tracks on an existing roadbed that is already built for tracks and had trains running on it within the last 15 years?
- CamperBob2 11y agoWhy would it cost billions to put tracks on an existing roadbed that is already built for tracks and had trains running on it within the last 15 years? Again, with all due respect, you don't live around here, do you? If so, for how long? (In other words, how familiar are you with what we call the "Seattle Process?") Exactly what contiguous roadbed(s) between Renton and Bothell are able to accommodate the addition of tracks without either massive eminent-domain fights, which will happen, or reverting the Burke-Gilman Trail to rail service, which will not?
- WalterBright 11y agoI've lived here for 35 years. I've ridden the "dinner train" that would run from Renton to Bothell on those tracks. I've seen trains running on it carrying airplane parts to Boeing. A freight rail bed is much more solid than a light rail bed needs to be. The right-of-way is still there, and no eminent domain confiscations would be needed. The Burke-Gilman Trail is not part of it. You can still see the tracks (corridor) on Google maps.