2 ms·
Only if you get rid of the behemoth slowpoke trains, elevate the rails, add more rail lines, and add a corridor to the East Bay. The Millbrae Caltrain/BART conn
by archagon 11y ago
Only if you get rid of the behemoth slowpoke trains, elevate the rails, add more rail lines, and add a corridor to the East Bay. The Millbrae Caltrain/BART connection is a joke.