2 ms·
"These [contingency] plans should include the assumption that the ICS (Industrial Control System) is actively working counter to the safe operation of the proce
by carapace 11y ago
"These [contingency] plans should include the assumption that the ICS (Industrial Control System) is actively working counter to the safe operation of the process."
Shades of "Maximum Overdrive". (Without the supernatural element, of course. Which makes it more scary if you're paying attention, eh?)