3 ms·
The estimated cost of finishing the second dam is much bigger than the "aid" from the link (the aid was meager $27m, split to 21 contractor), but still orders
by acqq 11y ago
The estimated cost of finishing the second dam is much bigger than the "aid" from the link (the aid was meager $27m, split to 21 contractor), but still orders of magnitude lower that the money spent by the US only on the military in Iraq.
Therefore not surprising, from the 2007 article behind your link:
"In a report published on Tuesday, the Special Inspector General for Iraq Reconstruction (SIGIR) said US-funded "short-term solutions" had yet to significantly solve the dam's problems."
To compare:
http://www.reuters.com/article/us-iraq-war-anniversary-idUSBRE92D0PG20130314 http://www.reuters.com/article/us-iraq-war-anniversary-idUSB...
"Iraq war costs U.S. more than $2 trillion"
If I calculate correctly, enough for 74,000 such "aid" fixes.