5 ms·
Our transit costs out of our Colo in Santa Clara are $6K/month for two dedicated gigabit lines. That translates roughly to 518 TB of data transfer a month if we
by ChuckMcM 11y ago
Our transit costs out of our Colo in Santa Clara are $6K/month for two dedicated gigabit lines. That translates roughly to 518 TB of data transfer a month if we could keep the pipes fully lit 24/7. Cogent has offered to make one of our gigabit lines burstable to 10G if we would like, same cost if we don't exceed a monthly average use of 1000Mbps.
And we use Linux so no Windows hosts charges.
There are more and more tools that are force multipliers for your Site Reliability Engineer (SRE) equivalents. You can't avoid swapping out dead drives, but with the right systems architecture you can make it pretty painless.
- rdl 11y agoWow, you're getting ripped off.
- deleted 11y ago[deleted]
- cbg0 11y agoIndeed, I've seen Cogent go for $800 - $1000 for a 1GE over 10GE commit.
- hhw 11y agoIt's possible to only pay the lower end of that range for a 2Gb 90th percentile commit on a 10Gb connection out of most major markets. Cogent pricing fluctuates wildly depending on your ability to negotiate. Ignore the whole song and dance when they have to bring in a VP into the call to specially approve the pricing they're trying to pitch to you at. Those are standard transit sales tactics. Or avoid Cogent's sales entirely by working with a reseller.
- matt_wulfeck 11y agoSpeaking with the VP to Negotiate for transit prices? Sounds like a pita. AWS knows that you're an engineer who just wants to write code and has made that as frictionless as possible. This goes back to my first point in that going into the DC requires staff with very different skill sets. It's not that it's not worth it, but there's a lot of costs involved part from the per-hour instance cost.
- NotSammyHagar 11y agoCan you elaborate? Discussions with details about things like this are always interesting.
- rdl 11y agoHe's paying 2-3x market (although 2Gbps isn't huge). Cogent is pretty much bargain-basement, too. I wish the industry would stop quoting prices they way we do (USD/Mbps, so e.g. $1.20/Mbps); Gbps is probably the right unit now, and it may make more sense to invert. But there are lots of terms involved in a transit contract; unless you're buying tens of gigs, crossconnect, port cost, commit, etc. may be more meaningful than per-Mbps cost. And pricing often depends greatly on exactly where in a city you're buying (at IX, carrier neutral facility, etc. will be cheapest; off net building or monopoly building will be most expensive) -- and of course Cogent transit vs., say, Level(3) transit are only superficially the same.