The barrier is likely the process through which PCT was mandated. Starting with this: https://www.fra.dot.gov/Elib/Document/2189 https://www.fra.dot.gov/Elib/D
by tyingq 11y ago
The barrier is likely the process through which PCT was mandated.
Starting with this: https://www.fra.dot.gov/Elib/Document/2189 https://www.fra.dot.gov/Elib/Document/2189
"(3) POSITIVE TRAIN CONTROL SYSTEM.—The term ‘positive
train control system’ means a system designed to prevent train-to-train collisions, over-speed derailments, incursions into established work zone limits, and the movement of a train through a switch left in the wrong position."
The deadlines, definitions, etc, don't line up well with a "What can we do now, with existing tech, that would add value at a low cost?" approach.