4 ms·
"Loaded TCO" means gear, space, power, cooling, transit, people... Those are high-level, and I don't remember a bunch of things that went into the 5-year TCO m
by antongribok 11y ago
"Loaded TCO" means gear, space, power, cooling, transit, people... Those are high-level, and I don't remember a bunch of things that went into the 5-year TCO model but it was complex.
If you have the talent and scale it's certainly doable, and like I said, we were at less than half of AWS. There are plenty of examples, one that comes to mind that is NOT hyper-scale is Server Fault.