3 ms·
I feel that with a modular design that includes remote handling capability you could test things out a lot faster on a full scale device. As to internal heatin
by Retric 17y ago
I feel that with a modular design that includes remote handling capability you could test things out a lot faster on a full scale device. As to internal heating issues, I don't think there is much problem extrapolating from Q0.7 at JET to Q1.2 at JT-60.
Large Plasma devices are "the sexy" but IMO it's just another engineering problem at this point. And you don't design large scale power plants to sit at the outer edge of their capabilities 24x7. So yes, the highest energy pulses are unable after a few seconds, but we have built steady state fusion reactors they just operate further from their limits.
PS: Finding T is a problem, but "just build it bigger" and suddenly D-D (or 75%D - 25%T etc) becomes reasonable.
Edit: I am suggesting building building something with 4x ITER's budget which should give you ~8x the plasma volume and a lower surface area to volume ratio etc. We can also pump of the field strength etc. But you are limited to how much heat the wall can take so the plasma conditions don't need to be as efficient.
- DaniFong 17y agoHi Retric, I do agree that the problem of controlling Q > 1 plasma becomes easier as you increase the volume. However, I don't think that's the biggest problem. As you yourself point out, you're limited in how much heat the wall can take. This is fundamentally the limiting factor in fusion power plant designs, unless a much more efficient direct conversion scheme is feasible. Why not instead take the tungsten panels you'd use and point a bunch of mirrors at it, achieving the same heat flux? Mirrors are just not that expensive. PS: Do you work in fusion, by the way? PPS: We should chat more. Send me a message at dfong at lightsailenergy.com