Almost all my death marches happened when the project is being authoritatively led by a non-engineer. An engineer's estimate is usually conservative. If someon
by muzani 11y ago
Almost all my death marches happened when the project is being authoritatively led by a non-engineer.
An engineer's estimate is usually conservative. If someone says it'll take 2 months, it'll probably take minimum two months. If you have good engineers, they're not trying to slack off by padding estimates. Respecting project estimates go a long way.
The right team also matters. In some, we had interns working on a key component. I'm not saying interns are bad, but generally you don't want grumpy, underpaid people to work overtime.
The designer has to respect the engineers. If you do a design that sticks to guidelines or something like Material Design, you'll be fine. But some designers try something really weird, in order to win an award, and some of those tiny details are pointless but would take 50% of the production time.
I actually did ragequit in most of those jobs. I know it sounds tantrum-y, but I'd say it rescued a lot of those projects. When you quit a well-paid job, the company immediately assumes that you have a very good reason to quit and starts listening. Then they allocate some resources, like a tester, dedicated designer, and the API guy sits with front end for those 100 hours straight.