2 ms·
I'm surprised a 3" water main stopped it, pipes in general are typically made of very soft, low quality steel. It probably just ran out of energy after flying
by dsfyu404ed 11y ago
I'm surprised a 3" water main stopped it, pipes in general are typically made of very soft, low quality steel. It probably just ran out of energy after flying through everything else.
The plug wasn't welded, it simply screwed into existing pipe threads replacing an overpressure valve.
- Someone 11y ago"It struck two 3 inch water mains and drove them and the electrical wiring above them into the concrete roof of the building, cracking it." => that concrete roof probably had more to do with the stopping than the pipes below it.