4 ms·
Everything else aside, it really feels like this article purposely stretches out the first example and compresses the second: * Joe gets told to work on his ow
by bmulholland 11y ago
Everything else aside, it really feels like this article purposely stretches out the first example and compresses the second:
* Joe gets told to work on his own, and only briefly consults a co-worker once. Janelle sits down with a senior dev and works through it together. How much of Joe's work could have been solved by sitting down with a developer?
* Every single command Joe writes out is included in the article, while docker steps (potentially more than one) are summarised with a sentence, e.g. "she just needs Docker on her system."
* Every time Joe has a problem, he has to figure it out on his own, google it, etc. Janelle just gets things pointed out to her by Rebecca.
Seems like a pretty biased comparison, even if the point is valid.