3 ms·
Most grid operators have displays like that. The California ISO has one.[1] PJM's is the most elaborate; search for "eData Guest view" to view it. It's too m
by Animats 11y ago
Most grid operators have displays like that. The California ISO has one.[1] PJM's is the most elaborate; search for "eData Guest view" to view it. It's too much information at first, but click on the "Big Picture" tab, then change one of the smaller panes to "Wind", and one to "Load", and you can see current load and how much wind power is contributing. Note the 5:1 variation in wind power over a day, across most of the northeastern US. "LMPs" shows the wholesale price of electricity at various points in the system. (It costs money to transmit power, so it's not the same everywhere.)
You can view the PJM's network issues by clicking on "Constraints" or "Emergencies". Typical message today: "As of 17:10 on 11.20.2015 a Post Contingency Local Load Relief Warning to maintain WARD 115 KV at 106 KV in the PN area has been issued for Transmission Contingency Control. Additional Comments: Pre-contingency voltage too high for caps at Mansfield and Niles Valley" Minor problem, already handled. If you really want to understand all this, PJM has lots of training materials. Start with "PJM 101".[2] Anyone running a big network or "cloud" may find it useful to see how a very large power grid is run. The main control room in Valley Forge, PA usually has less than 10 people.[3]
[1] http://www.caiso.com/outlook/SystemStatus.html http://www.caiso.com/outlook/SystemStatus.html
[2] http://pjm.com/Globals/Training/Courses/ol-pjm-101.aspx http://pjm.com/Globals/Training/Courses/ol-pjm-101.aspx
[3] http://www.elliottlewis.com/pjm-mission-critical-site/ http://www.elliottlewis.com/pjm-mission-critical-site/