4 ms·
To be fair, they're setting up the backup link. This DC, like many others, is well out of the way so running distinct fiber is lengthy process and even localizi
by acveilleux 11y ago
To be fair, they're setting up the backup link. This DC, like many others, is well out of the way so running distinct fiber is lengthy process and even localizing fault and getting crews on site can be a drag.
The location of Beauharnois probably being chosen because there's a Hydro plant there with 1903 MW of installed capacity.