The article focuses on an interlocking at West 4th St. It's manually controlled because all normal service goes straight through the interlocking without confl
by jrockway 11y ago
The article focuses on an interlocking at West 4th St. It's manually controlled because all normal service goes straight through the interlocking without conflicting with other trains. During construction, you can switch the 8th Ave. trains onto the 6th Ave. line and vice versa. That's all that interlocking does.
There is absolutely no need to upgrade this particular piece of infrastructure; it won't increase the throughput of trains through the interlocking, and it won't be easier to maintain. This stuff is _simple_ and works fine.
The upgrade to CBTC seems like a scam from the contractors to me. The Canarise Line was upgraded to CBTC, which can handle 26 trains per hour as opposed to the 12 trains per hour of the ABS signalling. 12 trains per hour is one train every 5 minutes. But they run trains every 6 minutes anyway -- there is no period in the timetable where they run 26 trains per hour, or even 2 individual trains at that spacing. (There is a period where they claim "every 4-6 minutes", for a maximum of 15tph if indeed there are two trains 4 minutes apart. I've just missed a lot of L trains, and waiting 6 minutes seems like "a good day" to me. As I understand it, the L gets most of its load from one station, and so it takes longer than the best headway just to load passengers there. Then, they can't turn trains quickly enough at the terminal. They blame the track layout but it's actually their relaying procedure that's the problem.)