3 ms·
I have many features that take more than a day to complete, but I prefer to do them in such a way that it doesn't break other stuff. That's just the way I prefe
by axod 17y ago
I have many features that take more than a day to complete, but I prefer to do them in such a way that it doesn't break other stuff. That's just the way I prefer to work. If I'm working through a big arch change, I'll do it in sections, each time making sure everything builds and works and is sane. I checkin often, once I hit something that builds+works.
That's just the way I work.
Similarly, I don't use threads in programs unless I absolutely categorically have to. It's a similar sort of thing. Call me crazy :/
I did use git for a bit, and thought 'meh'. It didn't solve any real world problem I had.