This happens occasionally in the PJM control area, even without a subsidy. PJM has a lot of nuclear and hydro plants in their territory. The nuclear plants don
by Animats 11y ago
This happens occasionally in the PJM control area, even without a subsidy. PJM has a lot of nuclear and hydro plants in their territory. The nuclear plants don't like to cut output at 4 AM when they'll have to crank it up at 5:30 AM; the thermal time constants in the system are too big. So they'll take an occasional hour of negative prices.
Hydro Quebec sometimes has too much water, in which case they run all their generators at capacity. They, too, will take an hour of negative prices rather than closing huge steel intake gates and taking a generator out of service for an hour, only to have to go through the startup and resynch process an hour later.
Wind output in the PJM area varies about 4:1 over a typical day. When peak wind lines up with minimum power demand, prices go negative, the automatic bidding system communicates back to the wind turbines, and the blades go to zero pitch, slow, and stop. The wind guys grumble about this, because some of them financed their operations without allowing for this. But it's not frequent. Wind turbines are good at shutdown and startup resynch, because they have to do it every time the wind slows down below useful speed.