3 ms·
The issue that keeps the remaining long haul (greater than 600 miles) on the road (vs rail) is timing, when you put something on the rail, you loose a day or so
by Silhouette 11y ago
The issue that keeps the remaining long haul (greater than 600 miles) on the road (vs rail) is timing, when you put something on the rail, you loose a day or so at one end in loading/classifying and another in classifying/unloading.
That's an interesting comment. Modern container ships and the infrastructure that supports them are surely one of the most effective logistical developments in human history, transferring huge volumes of cargo between the ships and road/rail at either end with impressive efficiency. It seems like you're suggesting that road/rail links bring in more of an overhead, despite the lower volumes on a train vs. a ship. Is that a fair conclusion from what you're saying?
If that's reasonably accurate, what do you think causes those extra overheads? Is it the wider variety of loads instead of everything being in standard shipping containers, the need for power to support some of them that you mentioned, or maybe just the need for better loading/unloading systems at road/rail transfers?
- Aloha 11y agoI think any multimodal transport has an inherent lag - and I don't think its worth the effort to get the lag out - beyond that because of the inherent delays (you gotta sort the railcar onto a siding, then unload the trailer (if its a can, it needs to be unloaded and mated with a chassis), put it somewhere so it can be picked up, the coordinate to have it picked up by a tractor.) I'd put the effort on getting shippers to accept the longer shipment times - a little less JIT inventory for example, its a change that needs to be made at all levels.